• English 中文
    ×

    NEWS

    MORE +

    K-2 Nuclear Power Unit Achieves Steam Turbine Turning Gear Accessibility

    On March 23, the first overseas unit of HPR1000, Karachi 2, achieved the operation of steam turbine turning gear. With all parameters verified, the milestone of turning gear accessibility was reached,...

    More content...

    New Record of Continuous and Safe Operation Achieved by the Fourth Overseas Unit

    By March 20th, the fourth overseas unit built by China, Chashma 4, has achieved 265 days and 17 hours of safe and continuous operation in the second fuel cycle, breaking the record created by the same...

    More content...

    The First Overseas HPR1000 unit Completed the Loading Test-Run of Circulating Water P...

    On March 18th, the first overseas unit of HPR1000, Karachi 2, completed the loading test-run of two circulating water pumps in 2PS pump station. The equipment operated stably during the test with all ...

    More content...
    在线视频亚洲系列中文字幕 - 视频 - 在线观看 - 影视资讯 - 品善网